Proposal: MULTI DWELLING-DEMOLITION. Proposed demolition of existing dwelling; construction of two x 2-storey attached 4 bedroom residences and construction of a new verge crossing. Period for representations closes: 29/04/2015
Proposal: MULTI DWELLING-DEMOLITION. Proposed demolition of existing dwelling; construction of two x 2-storey attached 4 bedroom residences and construction of a new verge crossing. Period for representations closes: 29/04/2015