Proposal: MULTI DWELLING-DEMOLITION-NEW SECOND DWELLING-GARAGE. Proposed demolition of existing cottage and the construction of a new second residence with detached garage. Period for representations closes: 20/10/2015
Proposal: MULTI DWELLING-DEMOLITION-NEW SECOND DWELLING-GARAGE. Proposed demolition of existing cottage and the construction of a new second residence with detached garage. Period for representations closes: 20/10/2015