O’CONNOR Development Application: 201017855 Address: 79 MACARTHUR AVENUE Block: 29 Section: 79

Proposal: Proposed amendments to DA approval – amendments include modifications to the roof, basement, unity layout, garbage room, open space, balconies, screens and external finishes; additions of screens to the fire stairs.  Period for representations closes: 27/03/2014 Click here to view the plans

O’CONNOR Development Application: 201324041 Address: 3 HAY STREET Block: 2 Section: 40

Proposal: Proposed amendments to DA 201324041 still under consideration – amendments include redesign to units 1-4, revised faþades, amended basement and stairs, relocation of waste storage; Reduction in building footprint at front setback and layout changes to Units 1-4; Removal of fixed structures forward of the front setback; Additions include a common entry/circulation, balconies to units 3 & 4 and new landscaping.  Period for representations closes: 21/02/2014 Click here to view the plans

O’CONNOR Development Application: 201324041 Address: 3 HAY STREET Block: 2 Section: 40

Proposal: MULTI RESIDENTIAL-DEMOLITION-9 NEW DWELLINGS-LEASE VARIATION. Proposed demolition of existing residence and associated structures; construction of one (1) three (3) bedroom residence and eight (8) one (1) bedroom loft style residences. Please see the application form for full lease variation details.  Period for representations closes: 06/12/2013 Click here to view the plans

O’CONNOR Development Application: 201323111 Address: 83 WATTLE STREET Block: 7 Section: 72

Proposal: MIXED USE – MEDICAL CENTRE – This proposal is to convert the building from a combined doctors (medical centre) and accommodation (residential) to full doctors rooms/medical plus. To extend the doctors rooms/medical centre. Period for representations closes: 28/03/2013 Click here to view the plans

O’CONNOR Development Application: 201222791 Address: 1 BURT STREET Block: 18 Section: 61

Proposal: COMMUNITY FACILITY-ST PHILLIPS CHURCH-ADDITION-CARPARKING. Proposed addition of a prebuilt building which will provide additional meeting area andf storage space; addition 4 carparking paces which includes two (2) accessible carparks. Period for representations closes: 18/02/2013 Click here to view the plans